Project Description

Armstrong Fluid Technology Ltd specialises in the construction of plantrooms and energy centres’ packaged plant systems.

To enable further UK expansion, enhance build and store facilities as well as greater collaboration between departments, Armstrong Fluid Technology relocated and opened a new purpose designed Systems Manufacturing Centre at Pointon Way, Droitwich.
Prime Solutions were called in to fit out the existing two storey office building.

Firstly, a full strip out occurred on both the ground and first floor to enable the fit out works to start.

A new double glazed entrance and reception area was to be formed and connected to adjacent newly formed administration offices. New bespoke made ash veneer doors were to be fitted which allowed access to the reception and a further set of matching doors were to be installed to allow access to the factory area.

Glass partitions and ceilings were to be added to create the ground floor conference/board room with feature walls of the company’s brand colours.
New kitchen units were to be added to the small teapoint in the ground floor office.

A new ground floor, large, inclusive breakout canteen area was to be formed and included various kitchen units along with an integrated built under fridge with icebox, grey concrete effect squared edged worktop, integrated dishwasher, bowl sink with Monobloc tap, crisp white tiles and vinyl flooring.

The first floor was to become a large open plan office with various smaller offices formed for the directors and smaller meeting rooms.

The first floor large open plan office was to have five vision windows inserted in the connecting wall between the office and factory. Openings formed, hardwood frames and glass installed.

Electrical works throughout included the installation of small power, LED lighting and dado trunking.

Air conditioning was serviced, reconfigured and an additional unit added.

The disabled toilet was to be fitted with bespoke made boxing to conceal the pipework and a new vinyl safety floor added.

Full decoration with feature walls of the company’s brand colours occurred throughout.

Window blinds were repaired.

Flooring was made good but if not possible new flooring was installed.

Office task chairs matching the company branding colours were supplied and installed.

The emphasis throughout this fit out was sustainability and to reuse where possible. If not possible the most sustainable products and systems were to be sourced and installed.

Project Details

Categories
Client Armstrong Fluid Technology Ltd
Location Droitwich, Worcestershire
Completed 12 weeks